{"id":5721,"date":"2025-08-05T06:50:00","date_gmt":"2025-08-05T11:50:00","guid":{"rendered":"https:\/\/www.paenergyratings.com\/blog\/?p=5721"},"modified":"2025-08-01T11:51:28","modified_gmt":"2025-08-01T16:51:28","slug":"pjm-capacity-auction-results-announced","status":"publish","type":"post","link":"https:\/\/www.paenergyratings.com\/blog\/pjm-capacity-auction-results-announced\/","title":{"rendered":"PJM Capacity Auction Results Announced"},"content":{"rendered":"\n<h2>PJM Capacity Auction Prices Skyrocket<\/h2>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"alignright size-medium\"><img loading=\"lazy\" width=\"300\" height=\"200\" src=\"https:\/\/www.paenergyratings.com\/blog\/wp-content\/uploads\/2025\/08\/PJM-auction-PA-electricity-300x200.jpg\" alt=\"PJM auction prices to line up generator capacity hit 22% higher than last year. Learn why and what you could see on future bills.\" class=\"wp-image-5756\" title=\"PJM Capacity Auction Prices Skyrocket\" srcset=\"https:\/\/www.paenergyratings.com\/blog\/wp-content\/uploads\/2025\/08\/PJM-auction-PA-electricity-300x200.jpg 300w, https:\/\/www.paenergyratings.com\/blog\/wp-content\/uploads\/2025\/08\/PJM-auction-PA-electricity-150x100.jpg 150w, https:\/\/www.paenergyratings.com\/blog\/wp-content\/uploads\/2025\/08\/PJM-auction-PA-electricity-230x153.jpg 230w, https:\/\/www.paenergyratings.com\/blog\/wp-content\/uploads\/2025\/08\/PJM-auction-PA-electricity-350x233.jpg 350w, https:\/\/www.paenergyratings.com\/blog\/wp-content\/uploads\/2025\/08\/PJM-auction-PA-electricity-480x320.jpg 480w, https:\/\/www.paenergyratings.com\/blog\/wp-content\/uploads\/2025\/08\/PJM-auction-PA-electricity.jpg 724w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><figcaption><center><em>The PJM capacity auction results for next summer are 22% higher. Learn what&#8217;s driving the higher price and what it means for consumers in entire region.<\/em><\/center><\/figcaption><\/figure><\/div>\n\n\n\n<p>Buckle up folks, it&#8217;s going to be a bumpy ride for <a href=\"https:\/\/www.paenergyratings.com\/deals\" target=\"_blank\" rel=\"noreferrer noopener\">electricity rates<\/a>. Last summer, PJM&#8217;s capacity auction rose over seven times their usual amount. And it sent the market into a frenzy. A lawsuit between PJM and\u00a0<a href=\"https:\/\/www.paenergyratings.com\/blog\/pa-governor-sues-pjm-over-electricity-rates\/\" target=\"_blank\" rel=\"noreferrer noopener\">PA Governor<\/a>\u00a0Josh Shapiro attempted to address these rising costs. But, while the\u00a0<a href=\"https:\/\/www.paenergyratings.com\/blog\/pjm-and-pa-governor-settle-auction-price-complaint\/\" target=\"_blank\" rel=\"noreferrer noopener\">complaint<\/a>\u00a0was settled, we\u2019re still on the hook for a rate hike from those crazy auction results.\u00a0To be sure, those rate hikes have hurt. Rates for some utility customers have <a href=\"https:\/\/www.paenergyratings.com\/blog\/ppl-hiking-your-price-to-compare-rate-june-1\/\" target=\"_blank\" rel=\"noreferrer noopener\">risen almost 16%<\/a>.<\/p>\n\n\n\n<p>Unfortunately, this most recent auction has jumped even higher. Last year&#8217;s auction cost around $2.2 billion. This year it has risen by 22% to an astounding $14.7 billion. Certainly, we can expect <a href=\"https:\/\/www.paenergyratings.com\/blog\/your-pa-electric-utility-rates-went-up-heres-what-you-can-do\/\" target=\"_blank\" rel=\"noreferrer noopener\">PA utility rates<\/a>\u00a0to jump again next summer. <\/p>\n\n\n\n<h3>PJM Grid Mismanaged?<\/h3>\n\n\n\n<p>This most recent <a href=\"https:\/\/www.reuters.com\/business\/energy\/biggest-us-power-grid-auction-prices-rise-by-22-new-heights-2025-07-22\/\">capacity auction<\/a> had prices jumping by a whopping 22%. In fact, they might have spiked more if not for the FERC approved <a href=\"https:\/\/www.utilitydive.com\/news\/pjm-shapiro-pennsylvania-capacity-auction-price-cap\/738591\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">price cap<\/a> that resulted from Gov. Josh Shapiro&#8217;s lawsuit. And electricity rates will continue to rise if PJM doesn&#8217;t solve their capacity issue.<\/p>\n\n\n\n<p>In what feels like a tale as old as time, critics argue that PJM rushed to retire old power plants while new ones languished in their <a href=\"https:\/\/emp.lbl.gov\/sites\/default\/files\/2024-04\/Queued%20Up%202024%20Edition_1.pdf\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">connection queue<\/a>. At one point, new projects faced a delay of\u00a0<a href=\"https:\/\/www.nrdc.org\/bio\/dana-ammann\/breaking-through-pjm-interconnection-queue-crisis\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">4 years<\/a>. That&#8217;s 286 GW of power sitting on standby. They&#8217;re now promising to <a href=\"https:\/\/paenvironmentdaily.blogspot.com\/2025\/05\/pjm-releases-list-of-51-fast-tracked.html\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">fast track<\/a> certain power projects. But it will take time for PJM to comply with FERC on their <a href=\"https:\/\/www.ferc.gov\/explainer-interconnection-final-rule\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">interconnection process<\/a>. <\/p>\n\n\n\n<p>Despite all this, PJM has <a href=\"https:\/\/www.pjm.com\/-\/media\/DotCom\/about-pjm\/newsroom\/2025-releases\/20250722-pjm-auction-procures-134311-mw-of-generation-resources-supply-responds-to-price-signal.pdf\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">added new generation<\/a> to the grid for the first time in the last four auctions. However, they barely cleared having enough to supply the region. And with new planned data centers pushing demand higher, this puts all PJM consumers at risk for <a href=\"http:\/\/www.paenvironmentdigest.com\/newsletter\/default.asp?NewsletterArticleID=63022\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">blackouts<\/a> during severe weather. <\/p>\n\n\n\n<h3>Data Centers Scooping up Power in PJM<\/h3>\n\n\n\n<p>Data center growth in PA is huge. <a href=\"https:\/\/www.datacenterfrontier.com\/hyperscale\/article\/55303578\/pennsylvania-raises-its-game-in-the-ai-infrastructure-boom-with-90-billion-investment-wave\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">$90 billion<\/a> worth of data center projects are expected to flow into PA in the next few year, promising revenue and jobs. But along with it comes a power drain. By 2030, PJM is expecting 32 gigawatts of increased demand on its system. However, all but two of those gigawatts are coming from <a href=\"https:\/\/www.reuters.com\/sustainability\/boards-policy-regulation\/americas-largest-power-grid-is-struggling-meet-demand-ai-2025-07-09\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">data centers<\/a>. <\/p>\n\n\n\n<p>In short, it&#8217;s not <a href=\"http:\/\/www.paenvironmentdigest.com\/newsletter\/default.asp?NewsletterArticleID=63063&amp;SubjectID=22\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">people<\/a> demanding power, but data centers. This unprecedented power demand is straining an already precarious grid. Massive\u00a0<a href=\"https:\/\/www.nesdis.noaa.gov\/news\/noaa-satellites-monitor-record-breaking-heat-wave\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">heat waves<\/a>, a nervous natural gas market, and aging infrastructure are all contrinbuting to the strain. <\/p>\n\n\n\n<h3>Avoid Rate Hikes and Save on Bills<\/h3>\n\n\n\n<p>It remains to be seen how this will ultimately affect prices in the region. PJM is expecting a smaller increase of 1.5-5% in <a href=\"https:\/\/www.paenergyratings.com\/resources\/high-pennsylvania-energy-bill\" target=\"_blank\" rel=\"noreferrer noopener\">electricity bills<\/a> due to these auction results. But as the rate increases stack, one thing is for sure. Saving on electricity has become even more important.<br><br>The best way you can save money is to lock in a fixed-rate electricity plan before rates jump again. Find the best plan for your home with us. Visit\u00a0<a href=\"https:\/\/www.paenergyratings.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/www.paenergyratings.com<\/a>\u00a0to explore the various electric plans in your area.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>PJM Capacity Auction Prices Skyrocket Buckle up folks, it&#8217;s going to be [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":5755,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_mbp_gutenberg_autopost":false},"categories":[90,9],"tags":[],"_links":{"self":[{"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/posts\/5721"}],"collection":[{"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/comments?post=5721"}],"version-history":[{"count":9,"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/posts\/5721\/revisions"}],"predecessor-version":[{"id":5757,"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/posts\/5721\/revisions\/5757"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/media\/5755"}],"wp:attachment":[{"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/media?parent=5721"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/categories?post=5721"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/tags?post=5721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}