{"id":6927,"date":"2026-11-05T06:05:00","date_gmt":"2026-11-05T12:05:00","guid":{"rendered":"https:\/\/www.paenergyratings.com\/blog\/?p=6927"},"modified":"2026-11-03T13:06:23","modified_gmt":"2026-11-03T19:06:23","slug":"why-does-pa-want-to-reactivate-shuttered-coal-power-plants","status":"publish","type":"post","link":"https:\/\/www.paenergyratings.com\/blog\/why-does-pa-want-to-reactivate-shuttered-coal-power-plants\/","title":{"rendered":"Why Does PA Want to Reactivate Shuttered Coal Power Plants?\u00a0"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Could Coal Power Save Consumers from High Bills?<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-medium\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.paenergyratings.com\/blog\/wp-content\/uploads\/2026\/11\/critics-PA-study-coal-power-300x200.jpg\" alt=\"Will reviving old coal power plant sites help bring down electric ratepayer bills in PA?\" class=\"wp-image-6955\" title=\"Could Coal Power Save Consumers from High Bills?\" srcset=\"https:\/\/www.paenergyratings.com\/blog\/wp-content\/uploads\/2026\/11\/critics-PA-study-coal-power-300x200.jpg 300w, https:\/\/www.paenergyratings.com\/blog\/wp-content\/uploads\/2026\/11\/critics-PA-study-coal-power-150x100.jpg 150w, https:\/\/www.paenergyratings.com\/blog\/wp-content\/uploads\/2026\/11\/critics-PA-study-coal-power-230x153.jpg 230w, https:\/\/www.paenergyratings.com\/blog\/wp-content\/uploads\/2026\/11\/critics-PA-study-coal-power-350x233.jpg 350w, https:\/\/www.paenergyratings.com\/blog\/wp-content\/uploads\/2026\/11\/critics-PA-study-coal-power-480x320.jpg 480w, https:\/\/www.paenergyratings.com\/blog\/wp-content\/uploads\/2026\/11\/critics-PA-study-coal-power.jpg 724w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption class=\"wp-element-caption\"><center><em>A new study for the PA PUC says reviving old coal power plant sites may be a quick way to cover future electric demand. But critics ask who the power is really for.<\/em><\/center><\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">The electric grid in PA is facing a problem. The state&#8217;s grid operator, PJM, has been battling low supply and rising costs for years. And now, reliability issues are front and center. Earlier this month, the Department of Energy declared a <a href=\"https:\/\/www.delawareonline.com\/story\/news\/2026\/10\/13\/power-grid-emergency-in-pennsylvania-what-residents-need-to-know-now\/92235540007\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">grid emergency<\/a> in the state. Combined with the recent <a href=\"https:\/\/www.paenergyratings.com\/blog\/what-is-the-pa-puc-warning-on-data-centers\/\" target=\"_blank\" rel=\"noreferrer noopener\">PA PUC warning on data centers<\/a>, state lawmakers are in a panic. And as a result, they&#8217;re looking to <a href=\"https:\/\/www.newsfromthestates.com\/article\/state-study-aims-identify-retired-power-plant-sites-can-be-reactivated\" target=\"_blank\" rel=\"noreferrer noopener\">reactivate<\/a> old coal power plants to keep the lights on. But some question whether coal can really combat rising\u00a0<a href=\"https:\/\/www.paenergyratings.com\/electricity-rates\" target=\"_blank\" rel=\"noopener\">electricity rates<\/a>\u00a0and demand for power.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">PA Power Grid Emergency <\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Earlier this month, a combination of high demand, low capacity, planned shutdowns, and power line repairs all lead to a danger of blackouts in the PJM Interconnection. And while this is the first time supply has become an emergency, it&#8217;s almost certainly not the last.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To maintain <a href=\"https:\/\/www.pjm.com\/-\/media\/DotCom\/committees-groups\/task-forces\/rcstf\/2024\/20240717\/20240717-item-02---rcstf-manual-13-revisions---redline.pdf\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">reliability<\/a>, PJM must plan on how much extra power they would need in case of \u201conce in ten year events\u201d such as severe weather. While this should ensure that the grid works during a crisis, PJM has fallen 6.8 gigawatts (GW) short of their reliability need. This is the second year in a row that <a href=\"https:\/\/insidelines.pjm.com\/pjm-capacity-auction-procures-138318-mw-of-generation-resources-as-work-continues-to-address-growing-electricity-demand\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">PJM<\/a> did not secure enough power to guarantee reliability. And so on top of <a href=\"https:\/\/www.paenergyratings.com\/blog\/pa-july-2026-electricity-bills-soar-51-over-july-2021\/\" target=\"_blank\" rel=\"noopener\">soaring electricity bills<\/a>, regular blackouts could become a reality unless the state finds more power plants.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">PA Looks to Coal Power to Solve Energy Crisis<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In response, the PA PUC has launched the<em> <\/em><a href=\"https:\/\/www.puc.pa.gov\/electricity\/pater-study\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\"><em>Pennsylvania Accelerated Transmission and Energy Redevelopment (PATER)<\/em> study<\/a>. The study began looking at 76 closed plant sites to see if they could host a power station. Currently about two dozen shuttered coal plants are being considered to be reactivated. The PA PUC aims to narrow down the list to five or so that can be quickly brought online. They are also looking at solar, battery storage, and even nuclear power using the old power plant sites.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But while the PUC estimates squeezing another 9 GW statewide from the old plants, it&#8217;s not enough. By 2030, PJM is expecting 32 GW of new demand on its system. Of this, 30 GW of new demand will come from data centers. As result, the PUC warns that even with more power becomes available, the state could still face serious reliability problems by next year.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But critics of the study say it doesn&#8217;t provide relief for rising customer bills. Instead, they say its support for data centers is a &#8220;distraction\u00a0and an unnecessary <a href=\"https:\/\/pennfuture.org\/post\/PA-Assesses-the-Grid-and-Plans-to-Redevelop-Shuttered-Power-Plant-Sites\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">side quest<\/a>.&#8221; Others point out that the study excludes <a href=\"https:\/\/www.facebook.com\/RepDanielle\/posts\/last-week-i-submitted-public-comments-to-the-pennsylvania-public-utility-commiss\/1499220612029198\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">future environmental impacts<\/a> on air, water, and local health. Basically, reviving old coal power plants may only be a band aid while renewables could provide a longer lasting fix.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Shop and Save on Electricity<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">To be sure, the PA grid is in a sticky situation; there are no easy solutions. At any rate, PA electric customers will see their utility bill rates rise further this winter.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Given this uncertainty, it\u2019s critical to shop now for the\u00a0<a href=\"https:\/\/www.paenergyratings.com\/best\" target=\"_blank\" rel=\"noopener\">best energy supplier<\/a>. And you can find the best plans for your home with us. Visit\u00a0<a href=\"https:\/\/www.paenergyratings.com\/\" target=\"_blank\" rel=\"noopener\">https:\/\/www.paenergyratings.com<\/a>\u00a0to see the electric plans that meet your needs.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Could Coal Power Save Consumers from High Bills? The electric grid in [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":6956,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_mbp_gutenberg_autopost":false,"footnotes":""},"categories":[90,47],"tags":[],"class_list":["post-6927","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-news","category-pa-puc"],"_links":{"self":[{"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/posts\/6927","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/comments?post=6927"}],"version-history":[{"count":5,"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/posts\/6927\/revisions"}],"predecessor-version":[{"id":6958,"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/posts\/6927\/revisions\/6958"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/media\/6956"}],"wp:attachment":[{"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/media?parent=6927"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/categories?post=6927"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.paenergyratings.com\/blog\/wp-json\/wp\/v2\/tags?post=6927"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}